SISTER & FRESENIUS MEDICAL CARE
PALAZZO PIGNANO (CR)
Customer: GSE Group | SIS.TER S.p.A.
Type: New production plant
Amount: reserved
Year: 2017
Site area: Mq 3.500
Services: Site Management & Direction | MEP | ARC.
Photogallery
Construction of a new plant for the production of medical devices which involved seismic adjustment and the conversion of a warehouse of approx. 3,500 sqm in a new factory for automated production of dialysis devices, in a controlled ISO 8 environment.
There were considerable challenges both from a design point of view and from a construction point of view: demolition of industrial flooring was carried out inside the warehouse to create new foundations on bored piles in support of the prefabricated structure. it supports the new plan on which the new production departments were built, which will house 26 production machines weighing between 7 and 27 tons each.